Fastener Compatibilityfastenercompatibility.com

Build a fastening system

Board, groove, clip, screw and substrate — review the complete connection.

Define the complete connection

System review

Choose the board and connection

Actual width
Pending verification
Actual thickness
Pending verification
Clip / screw system
Pending product-specific evidence
Alloy / screw length / router requirement
Pending product-specific evidence

Follow the load path

Conceptual component relationships. This diagram does not establish geometry, capacity or an approved attachment.

Joist / substrateBoardBoardScrew specificationClip (symbol only)Groove interface

Shapes and spacing are explanatory symbols, not machining drawings. Start/end, perimeter, fascia and stair connections need separate manufacturer or project details.

Decisions for this connection

  • A product system has not been verified for this combination. No clip, screw length or alloy is approved by this worksheet.
  • Identify the preservative and treatment level; check fastener and connector compatibility with that treatment.
  • Match the exact groove width, depth and position to the selected clip. The desired gap must agree with the documented system gap.

Field clip position study

For parallel continuous boards crossing the same supports, one clip position at each shared board edge on each support. This is a geometric scenario, not a fastening schedule.

Illustrated example: (3 boards − 1) × 3 supports = 6 positions.

Enter valid whole counts to calculate.

Excludes starts, ends, perimeter, board-end joints, blocking, stairs, fascia, spares and box rounding. Screw count and kits remain unknown until an exact system is selected.

Attach exact product evidence